WPC Grille Installation Guide

I. Installation Steps

1. Frame Making

Build the outer frame with WPC square profiles to design dimensions. Join corners with brackets and screws; check that the frame is square and rigid.

2. Grille Strip Installation

2. Grille Strip Installation

3. Overall Fixing

Mount the completed grille frame to the target surface (wall, railing, etc.) using expansion screws or suitable connectors; ensure full contact with the substrate.

4. Detail Processing

Sand edges to remove burrs; apply a protective coating if required. Check screw tightness and adjust for flatness.  Sand edges to remove burrs; apply a protective coating if required. Check screw tightness and adjust for flatness.

II. Notes

Provide intermediate support for any grille strip longer than 2 m to prevent sagging.  

Select UV-resistant models for outdoor applications to slow fading.

Reach Out To Make A Purchase Or Learn More

Get In Touch!

Accurately Match Needs and Create Exclusive Solutions Your Needs, Our Expertise

Quick Links

Quick Links

Contact Us

Contact Us

400-118-6990

+86-13923862712

Building D, LongJing industry Park, BanTian street, Longgang District, Shenzhen

Copyright @ SHENZHEN VANTINEWOOD NEW MATERIAL CO., LTD All Rights Reserved | Sitemap | Privacy Policy | Powered by Reanod